+86 10 8716 3255

Processing Goal:                          

Capacity Planning: 5000-10000 units annual

Chassis

Technological Process :

Interior/Exterior

Assembly

Offline Inspection

Workshop Process Goals
Assembly Line  Multi-vehicle models have a flexible product line
Inspection Line The degree of automatics at the domestic level

2. CKD/ENTIRE PRODUCTION PROCESS INPUT

3. CHINA'S INDUSTRIAL PARK BUSINESS AND MODEL TRANSFER

1. DKD/SKD(ASSEMBLY)INPUT

Domestic Logistics and Distribution Center

DKD/SKD

总装 Assembly

KD Factory Abroad

 

Assembly Process Planning/Design 

Import KD Parts

CKD/Entire Production Process

Localized Parts

 

 

Transfer

Product Line Transfer

 

Process Improvement

 

Process Matching  and Verification

 

Production Tactics and  Verification

 

Logistics Capability Verification

 

Quality Guarantee

Input Mature Product line 

 

 

Matching

 

 

Producing

CAPACATY BUILDING

We can help our partners to carry out capacity construction projects including but not limited to the following methods:

1. Introduction of DKD/SKD (final assembly) : import the adaptive improved products into overseas factories in the form of DKD/SKD, and meet the tariff requirements in the form of building only the final assembly line.

2. Import/whole process form: Completely Knock Down (CKD) will be adaptive improved product in the form of CKD/four process complete import local factory production, and use a percentage spare parts localization, does not exclude the new car factory or the existing factory upgrades, may include products, production lines, tooling, molds, and even the product files, process documents, technical standards, even for the local enterprises to cultivate personnel or system.

3. Operation and mode transfer of industrial parks in China: at the same time of product/capacity introduction, supporting parts manufacturers are included in the construction of automobile industrial parks to form scale effect and industrial cluster.At the same time, technical and training centers will be built to meet local demand for technical personnel and industrial workers.